PCCS has been delivering EPC projects across Nigeria's petrochem, refining, LNG, and power sectors for years. That work leaves us with significant surplus inventory — pre-procured spare parts that the original project no longer needs after engineering revisions, scope changes, or commissioning.
Rather than letting that capital sit in our warehouses for years, this exchange makes it available to the local market — at prices well below new import landed cost, with the same OEM quality, hydrotest certificates, and material traceability the original project required.
Items that have sat in our warehouses for 90+ days, or are clearly surplus to current EPC projects, are listed here with full specs, certificates, and inspection records.
Filter by category, manufacturer, condition, or warehouse. Each listing shows the source project, age in stock, and ask price compared to new import.
Request a quote. PCCS sales responds within 24 hours with confirmed availability, lead time, and final pricing including delivery to your plant.
Pickup from Port Harcourt, Lagos, or Onne — or we ship via our own logistics. Most deliveries land within days, not the 60–90 day import cycle.
The marketplace is the surface — the engine being built behind it is an AI matchmaker that, when a part is listed (or hits the "sat 90+ days" rule), finds the most likely Nigerian industrial buyers and drafts personalized outreach for the PCCS sales team to approve before sending. Same OEM quality, faster offload, deeper margin.
Match listings to industrial operators by sector, plant equipment, and recent procurement signals.
Every outreach drafted by AI, every send approved by PCCS — never spammed.
Targeting Nigerian buyers where local inventory beats import lead times by 80+ days.
Every inquiry, sale, and reply trains the matcher — buyer fit improves with every transaction.
Live inventory, updated as parts move.
See the catalog